Files

868 B

phase, status, completed
phase status completed
03-seo-i18n complete 2026-04-21

Summary: SEO & i18n

What was built (commits 03-01 à 03-03 + fixes)

  • Design system Nuxt UI v3, color-mode, sitemap config (feat(02-01))
  • AppHeader avec nav, lang/theme toggles, mobile drawer (feat(02-02))
  • AppFooter + default layout + useLocaleHead (feat(02-02))
  • Per-route SEO metadata et JSON-LD sur toutes les pages (feat(02-03))
  • i18n translations complètes FR/EN (feat(02-01))
  • Correction i18n langDir path, typecheck errors (fix(02))
  • lang attr dynamique sur <html> via useHead (fix(01) WR-04)
  • ContactForm avec validation Zod + route SMTP nodemailer (feat(03-01))
  • 9 shared components pour landing et projets (feat(03-01))
  • Landing page 6 sections, projects page, project detail, About, Contact, Fiverr, error.vue (feat(03-02/03))

Self-Check: PASSED