- REBRAND-01/02/03 commited in f72170b (JSON-LD + 14 i18n keys FR/EN)
- COCON-01 already shipped with M1.1 carry-over (HytaleRecentArticles
live sur /hytale.vue:38, bilingue FR/EN avec filter tag hytale)
M1.2 progress: 4/6 plans (67%). Seule Phase 10 (5 demo plugins Hytale)
reste — user code les plugins en side, Plan 10-03 (HytaleDemoGrid) à
attaquer quand ≥1 plugin shippé sur GitHub.
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
DEPLOY-02 + DEPLOY-03 validés. Build hang résolu via hook close dans
nuxt.config.ts (nuxt/nuxt#33987). Next: Phase 10 (démos plugins).
Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
- Deleted several planning documents including config.json, PROJECT.md, REQUIREMENTS.md, ROADMAP.md, STATE.md, and various phase plans.
- These files were no longer relevant to the current project structure and development practices, streamlining the codebase.
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
- Corrected the name in various files including CLAUDE.md, README.md, and configuration files to reflect the updated branding.
- Ensured consistency in the use of the new name throughout the project, enhancing brand identity.
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
- SUMMARY.md with 3 tasks, 17 files, 239s duration
- STATE.md advanced to phase 3 plan 1
- ROADMAP.md updated with plan progress
- COMP-01 to COMP-04 marked complete