Commit Graph

20 Commits

Author SHA1 Message Date
kayjaydee 215fba6342 docs(02): create phase 2 content plans 2026-04-11 03:58:21 +02:00
kayjaydee 8ce1b62240 docs(01): create phase 1 cleanup & fixes plans 2026-04-10 18:55:18 +02:00
kayjaydee e8bb0d0465 docs: create requirements, roadmap, and state
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-10 18:51:11 +02:00
kayjaydee 7f776298a9 chore: remove obsolete planning files for Nuxt 4 migration
- Deleted several planning documents including config.json, PROJECT.md, REQUIREMENTS.md, ROADMAP.md, STATE.md, and various phase plans.
- These files were no longer relevant to the current project structure and development practices, streamlining the codebase.

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-10 17:37:59 +02:00
kayjaydee c8dac9ac88 fix: update portfolio branding to "Killian' DAL-CIN" across all documentation and components
- Corrected the name in various files including CLAUDE.md, README.md, and configuration files to reflect the updated branding.
- Ensured consistency in the use of the new name throughout the project, enhancing brand identity.

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-08 19:54:46 +02:00
kayjaydee 25e910d030 docs(03-04): complete Dockerfile SSR + legacy cleanup plan
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-08 18:41:40 +02:00
kayjaydee 54cf031cd7 docs(03-03): complete About/Contact/Fiverr/Error pages plan 2026-04-08 18:39:22 +02:00
kayjaydee 5a7a816638 docs(03-02): complete main pages plan
- SUMMARY.md for landing + projects + detail pages
- STATE.md updated to plan 2/3 phase 3
- ROADMAP.md progress updated
- Requirements PAGE-01, PAGE-02, PAGE-03 marked complete
2026-04-08 18:39:09 +02:00
kayjaydee eff8ca4210 docs(03-01): complete shared components plan
- SUMMARY.md with 3 tasks, 17 files, 239s duration
- STATE.md advanced to phase 3 plan 1
- ROADMAP.md updated with plan progress
- COMP-01 to COMP-04 marked complete
2026-04-08 18:35:37 +02:00
kayjaydee b10ff2bc0b docs(03): fix plan blockers — remove formation completely, cleanup legacy
- Remove PAGE-07 from requirements (formation deleted per D-19)
- No redirect, /formation returns 404 naturally
- Plan 04 now includes full legacy src/ cleanup
- Update success criteria: 7 routes, SMTP instead of EmailJS

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-08 18:29:39 +02:00
kayjaydee 3e38ea02b1 docs(03): create phase 3 plans — pages, components, Docker SSR
4 plans across 3 waves: shared components + deps (wave 1),
pages landing/projects/detail + about/contact/fiverr/404 (wave 2),
Dockerfile SSR + GA4 + docker-compose (wave 3).

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-08 18:25:28 +02:00
kayjaydee eb3e979d59 docs(state): mark phase 2 verification pass and complete
All 3 TypeScript errors resolved, build passes, server renders.
Phase 2 SSR Shell marked complete.

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-08 16:41:19 +02:00
kayjaydee 09cfc0aaf3 fix(02): resolve 3 typecheck errors and i18n langDir path
- useSetLocale → destructured setLocale from useI18n()
- addSeoAttributes → seo option for useLocaleHead()
- process.env → import.meta.env for Nuxt compatibility
- langDir: 'locales/' → 'app/locales/' (Nuxt 4 resolves from project root)

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-08 16:31:58 +02:00
kayjaydee 5597c6a8dd docs(02-02): complete layout shell plan (header + footer + default layout) 2026-04-08 16:27:02 +02:00
kayjaydee 93e5d4bc29 docs(02-03): complete per-route SEO metadata plan
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-08 16:26:04 +02:00
kayjaydee 67c511f247 docs(02-01): complete design system + i18n config plan
Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-08 16:23:48 +02:00
kayjaydee 05e54db4ff docs(02): create phase 2 SSR shell plans 2026-04-08 16:10:05 +02:00
kayjaydee 26c2279bdf docs(phase-01): complete phase execution 2026-04-08 15:18:49 +02:00
kayjaydee f1e31fc043 docs(01): create phase 1 foundation plans 2026-04-07 23:39:15 +02:00
kayjaydee 8177ff045a docs: create roadmap (3 phases) 2026-04-07 23:24:38 +02:00